Fields of activity of static office

Designing of buildings

Concrete and masonry structures

  • Design and assessment of monolithic and prefabricated reinforced concrete structures
  • Design and assessment of monolithic and prefabricated reinforced concrete structures made of prestressed concrete
  • Design and assessment of masonry structures and vaults
  • Ensuring diagnostics of existing structures
  • Proposals for redevelopment and reinforcement of concrete and masonry structures optimization of designs with respect to economy and reliability
  • Structural analysis of structures with respect to fire effects
  • Static load capacity calculations for pedestrian bridges and bridges

Foundations and geotechnics

  • Remediation and static securing of rock massifs
  • Design and optimization of surface and deep foundation
  • Special methods of foundation of line and ground constructions (drilled micropiles, drilled, pile driven and overpriced piles)
  • Design and assessment of dynamically stressed foundations
  • Improving the bearing capacity of foundation soils
  • Remediation and increase of bearing capacity of existing foundation structures
  • Retaining walls traditional, pile, nailed, gabions,…
  • Special sheeting construction (steel sheeting with expansion system, pile walls, nail walls)

Steel and steel-concrete structures

  • Design of steel and reinforced concrete structures
  • Recalculation of existing steel structures, redevelopment and reinforcement designs
  • Static, dynamic and stability checks (chimneys, masts, towers, platforms, shells)
  • Structural analysis of structures with respect to fire effects
  • Static load capacity calculations for pedestrian bridges and bridges

Wooden construction

Technical assistance in emergencies

  • In fire accidents
  • In flood accidents
  • In sudden fall downs of objects

Author’s supervision of statics

  • The author’s supervision usually refers to the activity of the author of the construction documentation for the issue of a building permit. documentation for the execution of the construction or, more generally, the documentation of the comprehensive solution of the project, which verifies the compliance of the executed construction with this documentation during construction
  • Ascertained deficiencies and a proposal for a method and procedure for their removal are usually subject to entry in the construction log
  • The scope of author’s supervision extends to the stage of project preparation (elaboration of project documentation) and relates both to the stage of project implementation and to the stage of testing and certificates
  • Author supervision is performed on the basis of a contract with the builder usually by the person who prepared the relevant part of the project documentation
  • On significant, technically and architecturally complicated constructions, author supervision is usually permanent, on other constructions occasional, as required